Grid

Voltage

The map has four voltages. 380 kV and 110 kV lines carry power across the country. 20 kV lines carry it to the streets. The streets use 400 V. Power changes voltage only at a substation.

Lines connect only to equipment of the same voltage. Where lines of different voltages cross, they do not connect. A teal point shows a connection. Amber shows that the voltage does not match.

A line at a higher voltage loses much less power per kilometre: about 1% per km at 20 kV, 0.19% at 110 kV and 0.04% at 380 kV.

See also: Substation, Local substation, Junction, Grid losses

Substation

Moves power between two voltages, in both directions. Its transformer sets a hard limit on the power that it can pass. When a substation is full, the demand behind it gets no power.

Every town starts with a 110/20 kV Substation of 25 MW. Each bank that you add gives it 25 MW more, up to 175 MW.

A 380/110 kV Substation passes 300 MW, and a Grid Node passes 600 MW. Each bank adds a quarter of that, up to three banks.

See also: Transformer, Local substation, Voltage, Congestion

Transformer

Changes power from one voltage to another. Every substation and every Local Substation has one. Its rating is the most power that the substation can pass. A full transformer refuses new heat pump connections.

See also: Substation, Local substation, Rating

Local substation

A 20/0.4 kV substation that supplies the streets within 3 tiles at 400 V. Each street gets power from one Local Substation only. Use Assign streets to choose which one.

It carries 6 MW. When its streets need more, it cuts power to its own streets. Nothing upstream trips.

Each reinforcement step adds half of its built rating, up to four steps. Each step costs more than the step before. Reinforcement does not increase its reach.

With the Load Sharing development, some streets move at the end of each year. A Local Substation that ran above 90% of its rating in its heaviest hour gives streets to neighbours with room. Press Share load to spread the load evenly across a whole town.

See also: Streets waiting for a station, Transformer, Design peak, Smart meter

Streets waiting for a station

New streets that a town laid out with no Local Substation in reach. Nobody moves in until a Local Substation supplies them. Until then, they pay nothing. After 6 months, the town fines you every month.

The fine increases each month that the streets wait, up to four times the first fine.

See also: Local substation, Settlement

Circuit

One line between two points. A double circuit carries twice as much on the same route. A quad circuit carries four times as much. Both take flow away from parallel routes.

A 110 kV line carries 80 MW, a double circuit 160 MW and a quad circuit 320 MW. 20 kV feeders carry 14 MW, 28 MW and 56 MW in the same way. A 380 kV line carries 1,800 MW.

A storm can break both circuits of a double line at the same time.

See also: Rating, Above rating, Congestion, N-1

Rating

The most power that a line, transformer or unit can carry all the time. Damage lowers the rating of a line. The rating of a unit is its nameplate output times its condition.

See also: Above rating, Static rating, Condition, Headroom

Static rating

The rating on the plate. For a line, it is for air at 35 °C and almost no wind. In colder air or more wind, a line can carry more. In hotter, still air, it can carry less and can get too hot below its rating.

Without Dynamic Circuit Rating, protection uses the static rating. The extra rating in cold air is then not used.

See also: Dynamic Circuit Rating, Rating, Trip

Dynamic Circuit Rating

A development. Lines and transformers then get their rating from the weather, and protection uses it. Cold air and wind let them carry more. Hot, still air lets a line carry less.

A line carries up to 35% more than its static rating in cold air and wind. In hot, still air, it can fall to 70% of it.

A substation or Local Substation carries up to 25% more in air below 20 °C. It never carries less than its static rating.

The line card shows the lowest rating of the next 24 hours, from the forecast.

Without it, a heat wave above 35 °C can make a line too hot. The line then trips while it shows less than its rating.

See also: Static rating, Rating, Trip, Development

Above rating

A circuit above its rating gets hot. Far above its rating, it trips. You can authorise a circuit to run at up to 128% of its rating. The conductor then wears faster.

At 141%, a circuit trips in about 30 minutes. A short overload is safe, because a circuit trips only when it is too hot.

In the control room, you can authorise every circuit at once for 4, 12 or 24 hours.

See also: Rating, Trip, Control room, Congestion

Trip

A switch-off by protection, to prevent damage. A circuit that is too hot trips and stays open for 45 minutes. A unit can trip at random. A worn unit trips more often.

Each trip costs a circuit 4% of its condition. When a large unit trips, the frequency falls. The faster plants must then supply the missing power.

See also: Above rating, Unplanned outage, Frequency, Cascade

Congestion

There is enough generation, but a full line or substation cannot carry it to where it is needed. Customers behind it lose power. Plants on the other side must reduce output. A stronger line fixes congestion. More plants do not.

See also: Rating, Circuit, Spilled power, Unserved energy

Junction

Lines of the same voltage join where they cross. You can connect a new line to any point on an existing line. Where lines of different voltages cross, they do not connect.

See also: Voltage, Circuit

N-1

Shows if the grid can lose its largest single part and still supply power. On a town card, N-1 secure means that the town stays connected if one line fails. In the control room, N-1 cover means that you can replace the largest unit in service.

See also: Reserve margin, Response, Storm damage

Grid losses

Power that the wires lose as heat on the way to customers. Supply must cover these losses in addition to demand. Higher voltages lose much less per kilometre.

See also: Voltage, System balance

System balance

In every 15 minute step, supply must equal demand, plus grid losses, plus the power that goes into storage. Any difference is curtailed, spilled or left as unserved energy.

See also: Grid losses, Curtailment, Spilled power, Unserved energy

Frequency

The grid runs at 50 Hz. When a unit trips, the frequency falls. It falls faster when there is little spinning mass in the grid. Below 49 Hz, protection cuts load. At 47.5 Hz, the whole grid loses power.

See also: Spinning mass, Response, Cascade

Spinning mass

The energy in the rotors of the fuel and hydro units in service, measured in seconds. It slows the fall in frequency after a trip. Wind, solar and batteries add none.

See also: Frequency, Response

Response

Power that responds to a drop in frequency within 30 seconds. It is 5% of the rating of each fuel or hydro unit in service, plus the spare inverter power of your batteries.

See also: Frequency, N-1, Cascade

Cascade

A blackout of the whole colony after a trip. It occurs when the gap is too large for protection to close with load cuts. Fast plants restore part of the colony within minutes. The rest gets power back within 35 minutes.

A cascade adds to your blackout days. Spinning mass, response and spare fast plants all make a cascade less likely.

See also: Frequency, Response, Blackout days

Generation

Firm capacity

The power that you can rely on during a winter evening with no wind and no sun. Wind, solar and batteries count for nothing. A dam counts its river plus what its lake can supply during a 4 hour peak.

A hydrogen turbine counts only if policy lets it buy hydrogen when its own store is empty.

The planning screen shows firm capacity as a line. Every peak must stay below this line.

See also: Reserve margin, Design peak, Buying hydrogen, Dark doldrums

Reserve margin

How far firm capacity is above the expected peak. The planning screen shows it in amber below 20% and in red below 5%. Make sure that you can lose your largest unit on a cold evening with no wind.

See also: Firm capacity, Peak demand, N-1

Capacity factor

The output of a year, divided by the output at full power for the whole year. 7,000 full-load hours is the same output as full power for 7,000 of the 8,760 hours in a year.

See also: Firm capacity, Curtailment

Curtailment

Wind or solar output that is reduced because supply is more than demand plus what storage can take. You lose the sale. It costs no Record points and no disposal fee.

Operating policy sets which output is curtailed first: wind, solar, the newest units, or all of them in proportion.

See also: Spilled power, Must run, Spare power

Spilled power

Power that was made but not used. You pay $30 per MWh to dump it. It also costs Record points. It comes from units at their minimum output, units on Must run, or power with no line to carry it.

See also: Curtailment, Disposal, Minimum stable load, Congestion

Open-cycle gas turbine

A gas turbine without a steam turbine. It burns more gas per MWh than a combined-cycle plant. However, it starts in 15 minutes and can run as low as 10% of its rating. This makes it good for peaks and sudden gaps.

See also: Combined-cycle gas plant, Start-up time, Minimum stable load

Combined-cycle gas plant

A gas turbine that uses its hot exhaust to make steam for a second turbine. It burns less gas per MWh than an open-cycle turbine. However, it takes 2 hours to start and cannot run below 30% of its rating.

See also: Open-cycle gas turbine, Start-up time, Minimum stable load

Small modular reactor

A nuclear reactor that is built in a factory. It is cheap to run and emits no carbon. However, it takes 24 hours to start and cannot run below 55% of its rating.

See also: Start-up time, Minimum stable load, Firm capacity, Spent fuel

Lignite

Brown coal. It is soft and half water. It comes from open pits and is burned near the mine. It costs almost nothing to dig, but a Lignite Power Station emits about 1.3 t of CO₂ per MWh. No other plant emits more.

Its price is what your own mine spends to dig it, about $2.60 per MWh of heat. The crews and machines of the mine are its fixed costs. A mine earns back its cost only when its plants run a lot.

A Lignite Power Station must be within 12 km of a Lignite Mine. One mine digs 1.2 million tonnes per year. This is enough for two plants at full output.

See also: Lignite mine, Carbon intensity, Minimum stable load

Lignite mine

An opencast pit that digs lignite for the Lignite Power Stations within 12 km. It shares these plants with other mines in reach. It needs a seam next to it, as the Resources layer shows. It also needs power for its excavator and belts.

The mine marks out 5 by 5 tiles next to its buildings for its pit. The pit opens in the middle and gets wider in stages as the mine digs the coal. The earth above the coal goes to a spoil heap of 3 by 3 tiles behind the pit. When the pit is fully open, the earth goes back into it. Then the heap is planted and becomes forest. You cannot build anything else on the ground of the mine.

Its yard holds coal for one week. Its plants therefore continue to run during a short outage at the mine.

See also: Lignite, Bucket-wheel excavator

Bucket-wheel excavator

The machine that digs a lignite pit. It is a wheel of buckets on a long arm, as tall as a tower block. The best known is the Bagger 288. It moves up to 240,000 cubic metres of earth per day.

See also: Lignite mine

Solar power tower

Mirrors send sunlight to a tower, and the heat goes into molten salt. A steam turbine runs on the heat of the salt. The salt holds heat for 8 hours, so the plant also runs at night. It needs a clear sky.

Clouds stop it almost completely. It works only on the sunniest ground of a map. On good ground, it runs about 40% of the year. This is twice as much as a solar park next to it.

See also: Firm capacity, Minimum stable load

Biogas

Gas that bacteria make from manure, crop waste and food waste in a closed tank. A Biogas Digester makes it day and night and cleans it into methane. Your gas plants burn it before they buy natural gas.

The waste is a regional supply, like wood. Each farmland tile on the map gives about 0.012 MW of gas. Each person in the towns gives 110 kWh per year. Digesters share the waste. About 4% of the gas is lost when it is cleaned.

Gas that no plant burns goes into storage. Each digester dome holds 6 hours of gas, and Gas Spheres hold 4 days. A gas storage cavern holds the rest, next to its natural gas. The gas is flared only when every store is full. When they are nearly full, the gas plants bid low to burn it.

Its carbon comes from crops and grass that grew this year. Only the methane that escapes counts: about 0.03 t per MWh of gas, compared with 0.2 t for natural gas.

See also: Regional fuel supply, Renewable share

Single-axis tracker

Rows of solar panels on a north-south axis. They turn from east to west during the day to face the sun. Each MW makes about 15% more per year than a fixed panel. Most of the gain is in the morning and evening.

The rows must stand apart so that they do not shade each other. A plot therefore holds two thirds of the capacity of a fixed park: 30 MW instead of 45 MW. The same ground gives about a fifth less energy. Each MW costs about 12% more to build and a little more in upkeep.

The motors and controllers break down more than twice as often as a fixed park. Stuck rows lose about 1% of the year until repairs. In strong wind, the rows turn flat for safety and lose their gain until the wind drops. Under heavy cloud, most of the light comes from the whole sky. A tracker then gets about the same as a fixed panel.

See also: Capacity factor

Supercritical coal

A coal plant that runs its steam hotter and at a higher pressure. It burns less coal per MWh than an older coal plant.

See also: Minimum stable load, Carbon intensity

Running the plant

Dispatch

The automatic choice, every 15 minutes, of how much each unit makes. It follows the merit order, your operating policy and the instruction of each unit.

See also: Merit order, Operating policy, Must run, Reserve (unit instruction)

Merit order

All your units, in order of what they ask per MWh, cheapest first. The dispatcher calls them in this order until demand is met. The last unit that it calls sets the clearing price.

The internal carbon price changes the order. Units on Reserve always go last, even when they are cheap.

See also: Dispatch value, Clearing price, Internal carbon price, Reserve (unit instruction)

Dispatch value

What a unit asks per MWh in the merit order. A fuel plant asks its variable production cost plus any internal carbon price. Stores and dams ask the value of the energy that they hold.

See also: Merit order, Variable production cost, Value of stored energy

Variable production cost

What one more MWh from a unit costs: fuel, carbon and variable O&M.

See also: Dispatch value, O&M, Cost of supply

Must run

A unit instruction. The unit stays at or above a floor at every price. If it is off, it starts. Wind and solar on Must run are never curtailed. Any surplus is then spilled.

The floor is 60% of the rating unless you change it. It cannot go below the minimum stable load of the unit. On a dam, Must run sets a minimum release of water.

Unit instructions need the Grid Operations & Standards development.

See also: Reserve (unit instruction), Minimum stable load, Spilled power, Output cap

Reserve (unit instruction)

A unit instruction that puts the unit last in the merit order. The unit starts only when nothing else can cover the load. You cannot put wind, solar or geothermal on Reserve.

See also: Must run, Merit order, Headroom

Output cap

The most that a unit can make, as a share of its rating. A cap below 100% slows its wear and delays its overhaul. You lose the output above the cap.

See also: Must run, Condition, Overhaul

Minimum stable load

The lowest output that a unit in service can hold. It is 40% of the rating for coal, 30% for a combined-cycle plant and 10% for an open-cycle turbine. If demand is less than these minimums, the surplus is spilled.

See also: Spilled power, Must run, Start-up time, Ramp rate

Ramp rate

How fast a unit in service can change its output. Coal changes about 1% of its rating per minute. Faster plants, such as gas turbines and batteries, fix a shortfall that slow ramps cause.

See also: Start-up time, Headroom, Unserved energy

Start-up time

A cold unit makes nothing until it is on load. An open-cycle turbine starts in 15 minutes, a combined-cycle plant in 2 hours, coal in 6 hours and a small modular reactor in 24 hours. A warm unit restarts four times faster.

Each start costs money and causes wear. The wear counts as 25 running hours.

A unit that stops must stay off for its minimum down time. For coal, this is 8 hours. A unit that starts runs for at least 1 hour.

See also: Ramp rate, Headroom, Unplanned outage, Minimum stable load

Headroom

Spare room. In the control room, it is the output that your fuel, hydro and storage units can add in the next 15 minutes. Cold units count for nothing. On a line or substation, it is the rating minus what it carries now.

See also: Ramp rate, Start-up time, N-1, Rating

Control room

Emergency measures for the operating year: release storage reserves, run circuits above rating, ask industry to cut demand, rotate power cuts or defer an overhaul. They cost money, condition or goodwill.

They can use only the generation and grid capacity that you already have. Press V to open the control room.

See also: Emergency reserve, Above rating, Rota disconnection, Overhaul

Operating policy

Rules that the dispatcher follows all year. They set how storage charges and sells, what happens to surplus power, which plants run first and who loses power first in a shortfall.

A preset sets every policy at once. You can then change any setting. Press O to open it.

See also: Dispatch, Internal carbon price, Emergency reserve, Disconnect first

Internal carbon price

A carbon price that is added to the bids in the merit order only. You never pay it. Cleaner plants run first. Your fuel bill can increase.

See also: Merit order, Carbon price, Operating policy

Rota disconnection

Planned power cuts that move from street to street. You order them in the control room when supply is short. They share the cut between towns. They still count toward your blackout limit.

See also: Control room, Blackout days, Public opinion

Disconnect first

The policy that sets who loses power first in a shortfall: everyone in proportion, industry first, or homes first to protect industry.

See also: Unserved energy, Industry, Operating policy

Storage & hydrogen

State of charge

How much energy a store holds now, as a share of what it can hold.

See also: Round trip efficiency, Emergency reserve, Battery role

Round trip efficiency

The share of the power that goes into a store and comes back out. A Grid Battery returns 88%, and a Long-Duration Battery returns 60%. Power that is stored as hydrogen and burned again returns about 29%.

A Long-Duration Battery runs for 10 hours at full output. A Grid Battery runs for 3 hours. For each MWh that it stores, the Long-Duration Battery wears much less.

See also: State of charge, Electrolyser, Hydrogen turbine

Emergency reserve

The share of a store that is kept for shortfalls. Batteries, hydrogen stores, dams and solar towers can keep one. The dispatcher uses it only in a shortfall. You can release it in the control room.

Operating policy sets the reserve of all batteries, 15% unless you change it, and of all hydrogen stores. A dam and a solar tower keep none. To give one store its own reserve, set it on the card of that store.

See also: Battery role, Control room, Operating policy

Battery role

How one battery runs. Fleet follows operating policy. Backup stays full for shortfalls and never sells. Spare power charges only from surplus power that has no other use.

See also: Emergency reserve, Spare power, Operating policy

Spare power

A setting for batteries and air capture. They use only surplus power that has no other use. Without them, this power is curtailed or spilled.

See also: Curtailment, Spilled power, Battery role, Direct air capture

Value of stored energy

What a store or dam asks before it sells. It compares what the energy cost with the shortfalls that the energy can cover later. A full store sells early. A nearly empty store waits for a higher price.

A dam keeps its lake near a target level for each season. Its card shows the price that it asks for its water.

See also: Dispatch value, Merit order, State of charge

Electrolyser

Makes hydrogen from power. It cannot run below 15% of its rating, so a smaller surplus is curtailed. It is most efficient at about a third of its rating.

See also: Hydrogen store, Hydrogen turbine, Hydrogen blending, Minimum stable load

Hydrogen store

Holds hydrogen for the turbine. A tank farm holds 900 MWhth. A salt cavern holds 40,000 MWhth and takes 2.5 years to build.

With Hydrogen Gas Grid, spare hydrogen can go into the gas grids of the towns when a store is more than 95% full.

See also: Electrolyser, Hydrogen turbine, MW and MWh, Hydrogen blending

Gas storage

A store for natural gas: a cavern under the ground or steel spheres above it. Buy gas when it is cheap. Your gas plants burn it when the market price is above what you paid.

In winter, gas costs about 7% more than its trend. In summer, it costs 7% less.

You pay for gas when it goes into the store. It counts as fuel in that year. It costs nothing more when you burn it later.

Each store buys gas in one of three ways: when you tell it to, below a price that you set, or at a steady rate through the summer. It never buys and gives gas in the same hour. Gas Spheres buy only when you tell them to.

When the digester holders are full, biogas goes into the same store, next to the natural gas. Your gas plants burn the biogas first. Natural gas fills only the space that the biogas leaves.

See also: Merit order, Biogas

Hydrogen turbine

A gas turbine that burns hydrogen and starts in 15 minutes. It counts as firm capacity only if policy lets it buy hydrogen when its own store is empty.

See also: Buying hydrogen, Hydrogen store, Firm capacity

Buying hydrogen

The policy that sets if the hydrogen turbine can burn hydrogen that is bought at market. With Own hydrogen only, the turbine stops when its store is empty. With this setting, it does not count as firm capacity.

See also: Hydrogen turbine, Firm capacity, Hydrogen store

Hydrogen blending

If a boiler on a town gas grid is not hydrogen-ready, the grid can carry only about 7% hydrogen by energy. With Hydrogen Gas Grid, surplus hydrogen goes into the grid, and the town pays you its gas price.

A town can offer a supply contract for a fixed amount per year. If you deliver less, the town buys the missing MWh at market and bills them to you with a fine.

You can also convert a whole town to hydrogen from its card. If you deliver less than half of its need for a month, the town changes back to natural gas.

See also: Electrolyser, Hydrogen store, Boiler rule, Contract

Methanation

Turns hydrogen into synthetic gas that burns like natural gas. 1.25 MWh of hydrogen makes 1 MWh of gas.

See also: Electrolyser, Hydrogen store

Behind the meter

Batteries and cars that households own. They run to lower the bills of their owners, so they lower demand when power is expensive. The control room cannot use them.

See also: Hourly tariff, Smart meter, EV, Rooftop solar

MW and MWh

MW is power: how fast energy flows. MWh is energy: 1 MW for 1 hour. MWhth is the heat in a fuel, such as hydrogen or gas, before it is turned into power.

See also: Round trip efficiency, Hydrogen store

Heat

Heat pump

Electric heating that moves heat into a home from the outside air. Households install one when their old heating wears out and a heat pump costs them the least. It uses the most power on the coldest evenings, when it is least efficient.

Most flats have no room for one. A full transformer refuses new heat pump connections.

See also: COP, Heat pump grant and levy, Design peak, Transformer

COP

Coefficient of performance: the heat that a heat pump gives for each MWh of power that it uses. It falls when the outside air gets colder.

See also: Heat pump

Heat pump grant and levy

District settings that change what a heat pump costs households. A grant pays part of the cost. A levy charges households and pays you. With a levy, fewer households change to heat pumps.

See also: District, Heat pump, Fabric grant, Boiler rule

Fabric grant

Pays for insulation. It reduces heating demand and winter peaks. It can also reduce your sales.

See also: District, Heat pump grant and levy, Peak demand

Boiler rule

A district rule that bans oil and LPG boilers, or all fossil boilers, at the next replacement. It is free and quick. However, homes that must change are unhappy for a year. A heat pump grant halves this.

See also: District, Heat pump grant and levy, Public opinion, LPG

District

An area that you draw over a town. Its settings apply to every street in it: grant or levy, fabric grant, smart meter rollout, industry stance and boiler rule. You need the Grant Office to draw districts.

See also: Heat pump grant and levy, Fabric grant, Boiler rule, Smart meter

Smart meter

Lets a full Local Substation delay car charging and some household load until there is room. It also lets households choose an hourly tariff. You install them per district, in up to 95% of homes.

See also: Hourly tariff, District, Local substation

Heat network

Pipes that carry heat to a block of homes. The town builds and runs them. The network makes its own heat from gas, and that carbon is on your carbon bill. With Heat Network Supply, it can buy heat made with your power.

From the second year, each town plans networks in September. It plans one where enough owners sign up and heat pumps cost more. The first heat arrives about 14 months after the town decides.

From the card of a town, you can subsidise a network that the town does not build on its own.

See also: Network heat plant, Heat pump, Carbon price

Network heat plant

The large heat pumps and electric boilers that a heat network orders after its pipes are in. You connect them at 20 kV. The town pays the wholesale price plus $22/MWh. They lose power first in a shortfall.

Electric boilers use only power that the grid otherwise spills.

See also: Heat network, Clearing price, Spilled power

LPG

Liquefied petroleum gas. It comes in tanks to homes that have no gas main. Like oil, it is one of the first types of heating that households replace.

See also: Boiler rule, Heat pump

Towns & demand

Settlement

A town. A new town appears as an outline on the map. It has a marked site for its 110/20 kV substation, and nothing is built. It pays nothing until its streets have power.

When you build the substation on the site, the town becomes your customer. You then have 12 months to connect its streets to Local Substations. After that, the town fines you for each street that still waits.

In colonies from before 0.9.7, in the Challenge and in the Academy, towns start complete. They have a substation and Local Substations, but no line.

See also: Streets waiting for a station, N-1, Contract

Peak demand

The highest demand in a period. In most towns, it is on cold winter evenings, when people heat, light and cook at the same time.

See also: Design peak, Firm capacity, Reserve margin

Design peak

The demand that a substation must be built for. This is 18:00 on a winter evening at −6 °C, or a hot afternoon if cooling needs more. Rooftop solar does not count.

See also: Peak demand, Local substation, Rooftop solar, Heat pump

Electrification

Demand that moves to your grid when households install heat pumps and buy electric cars.

See also: Heat pump, EV, Design peak

EV

An electric vehicle. When EVs charge, they add to demand, mostly in the evening. Smart meters and hourly tariffs move charging to cheaper hours.

See also: Electrification, Smart meter, Hourly tariff, Behind the meter

Rooftop solar

Panels that households install at their own cost. On sunny days, they lower the load on your substations. But substations must still be big enough for winter evenings, when the panels make nothing.

See also: Design peak, Behind the meter

Industry

Factories in your towns. They are more sensitive to price than homes. Above about 85% of the affordable price, they start to close. A closed factory never opens again.

See also: Affordable price, Disconnect first, District

Energy poverty

Households that cannot pay your tariff. It starts just below the affordable price. People use less power, more bills are not paid, and households move away.

See also: Affordable price, Tariff, Public opinion

Public opinion

What the people of the colony think of you. It falls when your price is far above the fair price. Blackouts, rota cuts, boiler rules and broken contracts also lower it. Low opinion slows the growth of towns.

See also: Fair price, Energy poverty, Boiler rule

Unserved energy

Demand that got no power. Each MWh costs Record points and adds to your blackout days. Reports give the cause: too little generation, a plant in start-up, or a full line or transformer.

See also: Blackout days, Shortfall, Congestion, Disconnect first

Shortfall

Supply below demand. While it lasts, the clearing price shows Shortfall and stays at the cap of $3,000/MWh. Contracts count shortfall in days, the same way as blackout days.

See also: Unserved energy, Clearing price, Blackout days

Blackout days

Your total of power cuts so far, in days of the whole colony without power. A cut of a tenth of the load for 1 day counts as a tenth of a day. If you reach the limit of the scenario, the run ends.

See also: Unserved energy, Reliability, Cascade, Rota disconnection

Reliability

The share of demand that each town got, as an average over days. It sets the Reliable factor of the Record.

See also: Blackout days, Score factors

Market & money

Clearing price

The price of power in each 15 minute step. The last unit that the merit order calls sets it. Hourly tariffs, heat network power and battery trading follow it.

While supply is short, it stays at the cap of $3,000/MWh. While surplus power is dumped, it is −$30/MWh: the cost of the disposal.

Your own plants do not pay each other. The price is important for what customers on hourly tariffs and the heat networks pay you.

See also: Merit order, Shortfall, Disposal, Hourly tariff

Disposal

The removal of power that nobody uses. You pay $30 for each MWh that you dispose of. It adds to your cost of supply.

See also: Spilled power, Clearing price, Cost of supply

Cost of supply

What each MWh that you sell costs, as the regulator counts it. It adds the wear of your units and a normal return on them to fuel, carbon, disposal and running costs. It is an average over about two months. It is not your break-even price.

See also: Break-even price, Fair price, Tariff, Variable production cost

Break-even price

What each MWh that you sell costs you in cash: fuel, carbon, disposal, running costs and interest. It is an average over the last 12 months. If your tariff is higher, you make money on what you sell.

See also: Cost of supply, Tariff

Fair price

The price that the regulator thinks is correct for your power: your cost of supply plus $22/MWh. If you charge more than $42 above it for a long time, the regulator fines you. It also caps your tariff for 5 years.

See also: Cost of supply, Tariff, Public opinion

Tariff

The price per MWh that you charge customers. You set it in Finance. Revenue is the power delivered, times the tariff, times the share of bills that people can pay.

The Pricing Desk development can set it for you every month, based on the fair price.

See also: Fair price, Affordable price, Hourly tariff, Energy poverty

Hourly tariff

An option for homes with smart meters. They pay the clearing price plus your margin, for each hour. Its main effect is that car charging moves to cheap hours.

See also: Smart meter, Clearing price, Tariff, EV

Affordable price

What households here can pay per MWh. It rises slowly with incomes. How your tariff compares with it sets energy poverty, factory closures and the Affordable factor of the Record.

See also: Energy poverty, Industry, Tariff, Score factors

Credit limit

The most that you can borrow in the whole run. When a bill is more than your cash, the rest comes from your credit. You can repay at any time. If your cash is below zero and your credit is used up, the run ends.

See also: Tariff, Cost of supply

Carbon price

The price per tonne of CO₂ on the emissions of the colony. This includes home heating, vehicles and the gas of heat networks. It rises over the decades. Captured CO₂ is subtracted from the bill.

See also: Internal carbon price, Carbon intensity, Direct air capture

Contract

An offer that you can accept or decline: meet a target by a date to get a reward. You get a quarter of the reward when you sign. If you miss the target, you pay it back plus a penalty, and public opinion falls.

Targets include generating capacity, carbon intensity, renewable share, days of shortfall, a steady tariff and a connected town. A promise about price or reliability fails as soon as you break it.

It costs nothing to decline an offer.

See also: Public opinion, Shortfall, Renewable share

Development

The research of the colony. You get development points every month. A budget in Finance gives you more. Each programme unlocks buildings or features, such as the control room and the Grant Office.

See also: Control room, District

Climate

Carbon intensity

Grams of CO₂ per kWh of electricity supplied. It counts all the emissions of the colony: power, heating, vehicles, industry and farming, minus capture. A coal colony shows about 1,450.

See also: Renewable share, Carbon price, Score factors, Warming

Renewable share

The share of generation in the last 12 months that came from wind, solar, hydro and geothermal. Wood does not count.

See also: Carbon intensity, Contract

Warming

How much the planet has warmed. Every tonne that the colony emits adds to it. It falls only while you capture more than the colony emits. If it passes the limit of the scenario, the run ends.

See also: Climate headroom, Direct air capture, Carbon intensity

Climate headroom

How far warming is below its limit at the end of the run. It adds up to 5% of par to your final score.

See also: Warming, Par and grade

Direct air capture

A 30 MW machine that takes CO₂ out of the air, about 15 tonnes per hour at full power. Captured CO₂ is subtracted from your carbon bill. If it runs on coal power, it emits more than it captures.

It can run all the time, only in cheap hours, or only on spare power.

See also: Carbon price, Warming, Spare power

Dark doldrums

Days with little wind and little sun at the same time. They can last for several days. During them, wind and solar make almost nothing.

See also: Firm capacity, Value of stored energy

Storm damage

Storms lower the rating of overhead lines. A storm can break both circuits of a double line. Customers behind a damaged line lose power until the line is repaired.

See also: N-1, Rating, Circuit

Assets & upkeep

Spent fuel

Used reactor fuel. A Small Modular Reactor makes about 1.5 t per year. The fuel stays on the site, first in a pool and then in casks. It costs money every year, even after you demolish the reactor.

When a tonne leaves the reactor, you pay $1 million into a disposal fund. This is about $3 per MWh. It costs $1.5 million to load a cask of 10 t. Storage costs $12,000 per tonne per year. A closed site costs $4 million more per year.

The pool holds 17 t. The cask pad is built with the reactor and holds the fuel of its full life of 60 years: 8 casks, 97 t in total. Only a reactor that runs past its design life fills them. It then cannot refuel, and it stops. If you rebuild it in place, you get a pad for one more life.

See also: Small modular reactor

Condition

The state of a unit or line, as a percentage. Output and line rating are multiplied by it. Age lowers a maximum that no repair can raise. You can repair damage below that maximum.

See also: Overhaul, Unplanned outage, Design life, Rating

Unplanned outage

A unit that trips without warning. The risk increases with the running hours since its last overhaul, and with lost condition. Each start counts as 25 running hours.

See also: Overhaul, Condition, Start-up time, Trip

Overhaul

A planned shutdown of days to weeks. It restores condition and resets the running hours. It costs the least if you book it during planning. A crew that you send during the year costs 45% more.

Choose a month when other plants can cover the outage. After the design life of a unit, an overhaul can no longer restore its condition.

See also: Condition, Unplanned outage, Design life, Planning phase

Design life

How long a unit is built to last. After that, its condition falls faster than an overhaul can restore it. Rebuild it in place, repower wind or solar for about half the cost of a new unit, or retire it.

See also: Condition, Overhaul, Demolition notice

Demolition notice

When you demolish a unit, it leaves the system at once. Crews clear the site 3 months later. Until then, you can cancel at no cost.

See also: Design life

O&M

Operations and maintenance. You pay fixed O&M every year, even when a unit does not run. You pay variable O&M on every MWh that it makes.

See also: Variable production cost, Cost of supply

Regional fuel supply

Wood plants, waste plants and biogas digesters each share one regional supply. Each new plant divides the supply further. When supply is short, every plant on it runs below its rating.

See also: Firm capacity, Renewable share, Hot field

Hot field

One area of hot ground on the geothermal overlay. It holds a fixed amount of heat. All geothermal plants on it share that heat. When they need more than it holds, all of them run below their rating.

See also: Regional fuel supply, Firm capacity

Scoring & the run

The Record

Your live score. Every MWh that you deliver adds points. The points are multiplied by how clean, reliable and affordable your power is. Unserved and spilled power remove points.

You earn 1 base point per 100 MWh delivered. Each unserved MWh costs three times what a delivered MWh earns. Each spilled MWh costs the same as a delivered MWh earns.

When a run reaches the end of its term, you can continue to play. The result stays as it was at the end of the term. The extra years do not add or remove points.

See also: Score factors, Par and grade, Unserved energy, Spilled power

Score factors

Three multipliers on the points that you earn. Clean follows carbon intensity. Reliable follows the share of demand served. Affordable follows how your tariff compares with what people can pay.

See also: The Record, Carbon intensity, Reliability, Affordable price

Par and grade

Par is the score that a competent run of this scenario earns. Your grade compares your final score with par. It goes from E up to S, which needs 130% of par.

At the end of the run, a finished run adds 6% of par. Climate headroom adds up to 5%. Cash minus debt moves the score up or down by up to 3%.

See also: The Record, Climate headroom

Planning phase

Each year starts with planning. Time stops while you build, book overhauls, borrow, sign contracts and set policy. Then the operating year runs. At the end, an annual review explains what happened.

See also: Overhaul, Operating policy, Contract