Gameplay video · 17 seconds
Building and wiring a wind turbine
The player places a wind turbine from the build bar and connects it with a 20 kV line. Construction takes 6 months of game time.
This is a recording of Powerstate, a power grid simulation game that runs in your browser. The game is free to start. The clip has no sound.